Winter Maintenance

Ricket entering Minffordd @ 1035.jpg (43867 bytes)Blanche worked many of the trains through the Christmas and New Year period and is expected to be the high mileage single engine this season.

The policy is to get the most out of the remaining boiler ticket and take advantage of the running gear being in generally goodRicket at Minffordd @ 1036.jpg (29971 bytes) condition.

Since Christmas the RicketRescue team and the works staff have stripped the valve gear, re-fixed the the weighbar balance weight as it was loose and replaced all the pins and bushes in the valve gear. She has also had her annual boiler inspection which Ricket departing Minffordd @ 1038.jpg (27560 bytes)she passed without problem. This was done earlier than necessary (it only having been done last August) so she can go through the season without further testing.

After a test run on 22/02/01 Blanche pulled the service trains on 23/02/01 and is scheduled to work through the Ricket departing Minffordd @ 1038a.jpg (22291 bytes)weekend.

The following photo's show here making her way through Minffordd on 23rd February 2001. Thanks to MacTalkative for the demonstration of his digital Christmas prezzie.

                       Click on the pic for a bigger image